Golf Puyenbroeck Wachtebeke

Hybrid Short-Span Bridges for the Redevelopment of Golf Puyenbroeck

Project Information

Location:
Golf Puyenbroeck Wachtebeke, Belgium

Bridge Type:
Steel and Wooden Hybrid Bridges

Project Scope:
Design, Build, Delivery and Installation

Completion:
2024

Client:
WULTEPUTTE

Commissioned by WULTEPUTTE, BestBridges delivered several hybrid short-span bridges as part of the redevelopment of the golf course at Puyenbroeck in Wachtebeke.

A total of six bridges were constructed, each featuring a steel supporting structure combined with timber cladding and decking. These hybrid steel-timber bridges combine the best qualities of both materials: the robustness and durability of steel together with timber finishes that offer a low environmental impact and integrate harmoniously into the surrounding landscape.

The grooved timber decking developed by BestBridges further provides a safe and comfortable passage for pedestrians in all weather conditions.

Balustrades

Various types of wooden balustrades are available, made of tropical hardwood such as Azobé or Bilinga. These balustrades offer great architectural freedom, allowing them to be perfectly adapted to the bridge’s design. The balustrades are easily dismountable, ensuring easy long-term maintenance without affecting the integrity of the bridge.

timber bridge overview
wooden bridge on water
exploded view of railing installation