LOCATION
Willebroek, Belgium
TYPE
Shoreline Reinforcement
MATERIAL
Wood
PROJECT SCOPE
Delivery and installation
COMPLETION
2026
CLIENT
De Vlaamse Waterweg
Groep De Vlieger BV
Cartelvissers vzw, Anrob NV
Commissioned by De Vlaamse Waterweg and Anrob/Groep De Vlieger, BestBridges was responsible for supervising and installing a 570-meter-long wooden revetment along the banks of the Cartelvissers vzw fishing pond .
Efficiency was a key driver in this project. By optimizing the on-site organization and deploying resources strategically, our team was able to complete the entire installation in just two weeks—significantly faster than the originally planned three-week timeline.
This sustainable wooden structure provides robust protection against erosion and enhances the long-term stability of the riverbanks. At the same time, the new revetment ensures safe and improved access for users, with a strong focus on conservation and minimal disruption to the surrounding natural environment.
Custom-designed Pedestrian and Bicycle Bridges?
Send us your preliminary design or idea. You’ll receive an initial assessment of feasibility and budget. This way, you can start the bidding process with fewer worries.
CompositeLABRenovation
Street FurnitureWalkwayWood
Street FurnitureWalkwayWood
CompositePedestrian Bridge
Bicycle BridgeCompositePedestrian Bridge
Pedestrian BridgeStreet FurnitureWalkwayWood
LABWalkwayWood
Street FurnitureWalkwayWood
Pedestrian BridgeSteel
Bicycle BridgeCompositeLAB