Design, engineering, fabrication, and installation of bridges

Custom-Designed Bridges, From Initial Sketch to Installed Bridge

From design and engineering to manufacturing and installation: BestBridges provides custom-built bridges and walkways. We aren’t limited to a single material or manufacturer, so we choose the solution that best meets the technical and budgetary requirements of each project.

bestbridges walkways and bridges compilation video

Bridges by type and material

Where Would You Like To Start?

Do you already know exactly what type of bridge you need? Or are you thinking in terms of materials?

One-stop shop for bridges

Why BestBridges?

Green circle with a dot

Material-neutral

There’s no catalog we need to defend. The technique determines the material.


Green house icon

Everything under one roof

Design, engineering, budgeting, manufacturing, and installation. One point of contact, one point of responsibility.

Green ruler with an arrow

Strategy and Implementation

We’re out on the site ourselves. That hands-on experience informs every design we create.

Bridges made of steel, wood, or composite

Which Material Goes Well With Your Bridge?

There is no single “best” material, but there is a best choice for your span, budget, and maintenance timeline.

Icon for wood material

Wood

Wood is a natural building material with a warm appearance that stores CO₂ as it grows. With the right choice of hardwood species, thoughtful design, and periodic maintenance, it offers a long service life and blends harmoniously into both natural and urban environments.

Icon for composite material

Composite

Composite is an innovative fiber-reinforced building material that does not rot, does not corrode, and requires little maintenance. Thanks to its low weight, long service life, and high durability, it is particularly well-suited for use in challenging environments.

Icon for steel material

Steel

Steel is a strong and versatile building material that is ideal for slender structures and long spans. Thanks to its high load-bearing capacity, proper preservation, and periodic maintenance, it offers a long service life and reliable performance.

Looking for Advice?

BestBridges LAB evaluates your preliminary design for feasibility, practicality, and cost. And then comes the materials.

From preliminary design to tender documents

From the First Sketch to the Completed Bridge

01

Design

Variants, feasibility, and cost: our LAB gets the job done.

02

Engineering

Design and construction details. We make sure everything is right.

03

Budgeting

Bill of Quantities and Specifications. The right numbers, with no surprises.

04

Production

Off-site at certified partners. That’s how we ensure quality.

05

Placement

At the site, by our own team. That way, we keep an eye on everything.

Realized Bridges

Browse our portfolio of projects.

Custom-made bridges?

Start Your Next Bridge or Deck Project With Confidence

Send us your preliminary design or idea. You’ll receive an initial assessment of feasibility and budget. This way, you can start the bidding process with fewer worries.

Frequently Asked Questions

Can’t figure it out? Or do you have a question that isn’t listed here? We’d love to hear from you. Just get in touch with us.

The choice of the right material depends on the loads, the environment, the maintenance requirements, and the available budget. Wood is a sustainable choice for short- to medium-span bridges; steel is ideal for long spans due to its high strength and stiffness; composite is lightweight, corrosion-resistant, and low-maintenance, and is particularly well-suited for longer spans. Hybrid bridges combine the advantages of steel and composite materials and offer an efficient solution for larger spans and renovation projects. At BestBridges, we evaluate each project to determine which material choice provides the best solution from a technical, economic, and sustainability perspective.

Depending on the complexity of the project, the design and engineering phases typically take one to four weeks. Delivery of the materials takes an average of six to eight weeks, after which the bridge is manufactured and subjected to a thorough quality control inspection. This process usually takes two to four weeks. The bridge is then transported to the construction site and installed, which typically takes one day.

Yes. At BestBridges, we take care of everything for you throughout the entire process: from design and engineering to production, transportation, and installation. If desired, we can also coordinate the construction of the foundations, abutments, and associated infrastructure through our network of experienced contractors. This way, you have a single point of contact for the entire project, from initial design to completion.

BestBridges works with government agencies, engineering firms, architects, contractors, project developers, and private clients. We are often involved as early as the design phase, so that together we can develop the most efficient, sustainable, and economically optimal bridge solution. From technical consulting and engineering to production, delivery, and installation, we guide the entire process. Thanks to our expertise in wood, steel, composite, and hybrid bridges, you have a single experienced partner and a single point of contact from the initial sketch through to completion.